M.V. Sabanto

A total of 15 job orders and 2784 man hours were invested in the rehabilitation of  project M.V. Sabanto. 

Completed on 20th July, 2022

A total of 15 job orders and 2784 man hours were invested in the rehabilitation of  project M.V. Sabanto.  These job orders consisted of the following: Hand scraping of vessel  to remove marine growth (6hours), pressuring washing of vessel’s  hull below waterline using 4500 psi pressure washer(8 hours), Sandblasting hull of vessel from keel to the top of bulwarks, sea chest grid and deck (120 hours), Non-destructive testing(10 hours),Spray painting hull of vessel below waterline, above waterline, painting of draught marks, plimsol marks, vessel’s names, IMO number, port of registration number (336 hours),Welding and fabrication of all corroded steel inclusive of replacement and installation of zinc anodes(672hours),Tank cleaning of fresh water tanks and daily service tanks (96 hours),Inspection, repairs and maintenance of port and starboard side propellers, propeller shafts, bushings, glands, rudder stocks and seals (480 hours), Valve repairs for over board valves and defective valves (96 hours),Electrical repairs on all lights of vessel, throttle control system examined and repaired and servicing of electrical panels (288 hours),Carpentry repairs were done on all doors of the vessel (336 hours), Plumbing services for toilets, sinks, pipes (192 hours) and Repairing of hydraulic lines, blige pumps, steering pumps, hydraulic motor (144 hours).

Customer feedback- Our clients were very satisfied with our services,

Other Projects

DUSK 1

Dusk 1 Dimensions – 24 meters x 6.6 metersVessel type – TugGross Tonnage – 115 tonsDate Docked – 20th July, 2023Lay days – 4 days

Seacor Tarahumara

Seacor Tarahumara Dimensions – 67.4 meters x 14.6 metersVessel type – Supply VesselGross Tonnage – 1634 tonsDate Docked – 1st July, 2023Lay days – 4

KOOLE 74

Koole 74 Dimensions – 73.95 meters x 10.8 metersVessel type – General CargoCargo Capacity – 1400 tonsDate Docked – 15th May, 2023Lay days – 14

M.V. Hilton Joseph

M.V. Hilton Joseph General repair services including engineering, electrical, propulsion, accommodation upgrades, marine fitting, sand blasting and painting as well as outsourced procurement, testing, trials

M.V. Sabanto

M.V. Sabanto A total of 15 job orders and 2784 man hours were invested in the rehabilitation of  project M.V. Sabanto.  Completed on 20th July,

M.S. Maleka

M.S. Maleka 9 job orders and a total of 1181 man hours were invested to  complete  project M.S.Maleka. Completed on 17th October, 2022  9 job

Do you need help or assistance?

Guyana Port Inc. 
Lot 12 Public Road Support,
East Bank Demerara,
Guyana

For any inquiries, questions or
commendations, please email:

Get in Touch with Us

Complete the form below to quickly contact us with your inquiries and comments.